New Cable Assembly for the Food and Beverage Market

CUSTOMER PROBLEM:

A revo machine at a protein processing plant was used a lot and was plugged and unplugged repeatedly. Heavy equipment was being rolled over the electrical cord/plug assembly. Plus, the cable was being used to pull the plug out of the electrical socket causing damage to the conductors and connection.

TPC SOLUTION:

TPC designed a new assembly with upgraded cable that has required no maintenance since installation and the writing of this report, approximately 6 months.

CUSTOMER’S RESULT:

The customer saved $200 in material cost and $425 in labor savings and has been able to continue the use of the machine without failure for 6 months. They’ve gained 8 hours in production time.

TPC PRODUCT: Custom Assembly (MA101597F02)

Total Savings in Material and Labor = $625 and increased Production by 8 Hours
Source: TPC Cost Value Analysis Report #2511