<img alt="" src="https://secure.companyperceptive-365.com/785321.png" style="display:none;">
We experienced some failures with some of our armored cable runs and decided to give TPC’s 6/4 Super-Trex® a trial run and now we have installed close to 4,000 feet of this cable while experiencing zero failures.
Al Plybon
Electrical & Instrumentation Planner, Simpson Tacoma Kraft

Case Study: Magnetic Testing Machine in Oil & Gas Application

CUSTOMER PROBLEM:

The ordinary cable jacket would fail due to exposure to the isopar chemical solution used in the Magnaflux testing process. The customer would need to replace the cable approximately every 3 months.

TPC SOLUTION:

The customer replaced 15' of cable in 6 different units.

CUSTOMER’S RESULT:

To date, this cable replacement has been working for 10 months straight without repair or failure. The customer has saved over $2,000 in material costs, $6,160 in labor costs and over 136 hours of production in 10 months.

TPC PRODUCT: Super-Trex® 600 Volt Welding Cable

 

Download the printable PDF.

We experienced some failures with some of our armored cable runs and decided to give TPC’s 6/4 Super-Trex® a trial run and now we have installed close to 4,000 feet of this cable while experiencing zero failures.
Al Plybon
Electrical & Instrumentation Planner, Simpson Tacoma Kraft

Your Solution Starts Here

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote