We needed a better cable in critical areas of our control system so TPC showed us their Super-Trex® and Trex-Onics® products but TPC challenged us to try anything to cause a failure. We decided to try the most abusive thing we could think of — run the cable over with a 60,000 lb track rig. When the initial test didn’t cause a failure, we performed a 0 degree turn, pivoting directly on the cable. The only damage to the cable was the abraded outer casing. Since this experiment 3 years ago, we have been using Super-Trex® and Trex-Onics® for our mission-critical cable assemblies, without a failure.
Al Creely
Senior Control Engineer Schramm, Inc.

Case Study: High-Quality Welding Cable Installed at International Mine

coal-mining-cable-solutions

PROBLEM:

An international silver and copper mine was experiencing cable failures on their drilling jumbos due to the corkscrewing motion present during the tunneling process. Drill jumbos are seen most often in underground mines where drilling and blasting are present, or when rock hardness prevents typical tunneling machines to be used. When this South American mining customer realized they were replacing their cable too frequently on multiple jumbo drilling machines due to abrasion, they knew it was time to explore something a little more reliable that would resist tearing.

RESULT:

TPC's International Field Specialist examined the application carefully and suggested a 2/0 Super-Trex® 600 Volt Welding Cable as a longer-lasting solution. After switching to this cable, it lasted 14 months without replacement, saving them $8,300 in product and labor costs, and gaining them 244 production hours.

 

Read More Here 

 

We needed a better cable in critical areas of our control system so TPC showed us their Super-Trex® and Trex-Onics® products but TPC challenged us to try anything to cause a failure. We decided to try the most abusive thing we could think of — run the cable over with a 60,000 lb track rig. When the initial test didn’t cause a failure, we performed a 0 degree turn, pivoting directly on the cable. The only damage to the cable was the abraded outer casing. Since this experiment 3 years ago, we have been using Super-Trex® and Trex-Onics® for our mission-critical cable assemblies, without a failure.
Al Creely
Senior Control Engineer Schramm, Inc.

Your Solution Starts Here

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote