<img alt="" src="https://secure.companyperceptive-365.com/785321.png" style="display:none;">
We experienced some failures with some of our armored cable runs and decided to give TPC’s 6/4 Super-Trex® a trial run and now we have installed close to 4,000 feet of this cable while experiencing zero failures.
Al Plybon
Electrical & Instrumentation Planner, Simpson Tacoma Kraft

Case Study: Large Steel Customer Finds Solution for Rail Turner Abrasion and Flexing Problems

flexing-case-study-2513-1

CUSTOMER PROBLEM:

Our customer was using a shielded cable with Amphenol connectors in their rail turner application. It kept failing due to the extreme flexing that was needed in this application and the abrasion it was receiving. They were repairing or replacing this cable every two weeks — which took about 8 hours for each unit (they have 3 units).

TPC SOLUTION:

We suggested they try our Trex-Onics® brand Individually Shielded Encoder Resolver cable. The heavy-duty polyurethane jacket provides excellent protection against abrasion, oil and chemicals. We were also able to place connectors on each end so they could easily plug into the application when they received it.

CUSTOMER’S RESULT:

The customer tells us that TPC cable is still in this application after 30 months without repair or replacement. Initially, it was a more expensive cable, but we’ve been able to save this customer $11,500 in material costs, $141,600 in labor costs and a staggering 1,416 hours in increased production in the past 30 months.

 

Download the printable PDF.

We experienced some failures with some of our armored cable runs and decided to give TPC’s 6/4 Super-Trex® a trial run and now we have installed close to 4,000 feet of this cable while experiencing zero failures.
Al Plybon
Electrical & Instrumentation Planner, Simpson Tacoma Kraft

Your Solution Starts Here

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote