Case Study: Magnetic Testing Machine in Oil & Gas Application

CUSTOMER PROBLEM:

The ordinary cable jacket would fail due to exposure to the isopar chemical solution used in the Magnaflux testing process. The customer would need to replace the cable approximately every 3 months.

TPC SOLUTION:

The customer replaced 15' of cable in 6 different units.

CUSTOMER’S RESULT:

To date, this cable replacement has been working for 10 months straight without repair or failure. The customer has saved over $2,000 in material costs, $6,160 in labor costs and over 136 hours of production in 10 months.

TPC PRODUCT: Super-Trex® 600 Volt Welding Cable

 

Download the printable PDF.

Since we began using TPC, I am very happy to report we have not changed a single cable out to date. TPC has greatly reduced downtime and is an important asset to our welding safety program. I highly recommend TPC cables for any severe service condition.
Dennis D. Bullock
Boilermaker Leadman, Northtown Diesel Shop, Burlington Northern Railroad

Your Solution Starts Here

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote