<img alt="" src="https://secure.companyperceptive-365.com/785321.png" style="display:none;">
We have been extremely pleased with a variety of products TPC has brought to the table. TPC’s engineers provided us with a custom-designed solution that was extremely flexible and which has held up incredibly well over time. Since the custom assembly was installed a few years ago, the cable has shown no sign of damage, we’ve had no breakdowns, and we’ve made zero repairs.
Dustin Coats
Regional Purchasing Agent Leeward Renewable Energy (Formerly Infigen Energy)

Case Study: Multinational Conglomerate Finds a Solution For 500 Welding Leads and Saves Over $220K

impact-case-study-2452-1

CUSTOMER PROBLEM:

The ordinary welding cable our customer was using wasn’t holding up to the abusive environment it was in. They were using it throughout the facility — indoor and outdoor — and it was continually getting nicked and pinched and covered in drops of steel. They were repairing the cable every two months or so.

TPC SOLUTION:

We knew the TSE jacket on our Super-Trex® brand DC Welding cable would hold up to the weld splatter as well as heat and flame. Since it was being used inside and out, we made sure to recommend a cable that continued to stay flexible in all weather conditions, too.

CUSTOMER’S RESULT:

Initially, the customer was hesitant to spend the extra money on TPC cable. After seeing the results, that is not a concern. Our customer changed out the cable on 500 welding units resulting in a material cost savings of $167,750, a labor savings of over $52,000 for a total saving of over $220,000. We last checked in with them at 6 months after the change out and the TPC cable had not been repaired or replaced on any of the units — increasing their production by 2,250 hours!

TPC PRODUCT: Super-Trex® DC Welding Cable

Total Savings in Material and Labor = $220,000 and Increased Production by 2,250 Hours
Source: TPC Cost Value Analysis Report #2452

 

Download the printable PDF.

We have been extremely pleased with a variety of products TPC has brought to the table. TPC’s engineers provided us with a custom-designed solution that was extremely flexible and which has held up incredibly well over time. Since the custom assembly was installed a few years ago, the cable has shown no sign of damage, we’ve had no breakdowns, and we’ve made zero repairs.
Dustin Coats
Regional Purchasing Agent Leeward Renewable Energy (Formerly Infigen Energy)

Your Solution Starts Here

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote