      Company Avoids Unplanned Downtime by Not Having to Repair Welding Leads

      Welding Case Study

      Customer Problem:

      An American steel fabrication company was repairing 4/0 welding leads every three months and fully replacing them annually due to failure from being dragged, run over by vehicles, and generally damaged by environmental hazards. For each instance of failure, the cost to replace 100 feet of cable was $552 plus labor. Now, multiply that by 100 machines, and cable failure amounted to a $55,200 annual problem in materials alone, not to mention labor and downtime.
       

      TPC Solution:

      TPC Wire & Cable Corp. suggested Super-Trex® DC Welding Cable to the customer, a rugged and reusable cable designed for long life in welding applications. Containing 2 1/2 times more stranding than conventional welding cable, the cable’s bunch-stranded rope lay copper conductors resist fatigue and breakage. Its 100% fabric serve also prevents tearing and reduces jacket shrink-back. The specially compounded TSE jacket, itself, is 25% thicker than ordinary cable yet remains flexible and easy to work with while withstanding weld splatter, tearing, impact, abrasion, chunking, flame, and extreme temperatures.
       

      Fewer Welding Cable Repairs:

      The customer replaced commodity cable across 100 welding machines with TPC's rugged, long-lasting solution. A full 10 years later, in 2013, the customer confirmed that TPC's welding cable was consistently in operation without a single need for repair or replacement. By choosing TPC's solution back in 2003 and investing $146,100 just one time for materials and installation on all welding machines, the customer was able to save $570,900 over the course of 10 years. The customer also gained back 3,000 production hours that otherwise would've been spent repairing welding leads and replacing cable as a result of unplanned downtime.

       

      Download the printable PDF.

      Previously, concerning weld lines from other companies, the yard’s harsh environment along with shipboard operations caused downtime. Since selecting TPC, our cost has decreased, quality has improved, and our welders are pleased with the durability of the welding and arc lines.
      Douglas E. Kubizna
      Supervisor, Norfolk Naval Shipyard

      Your Solution Starts Here

      Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
      Request A Quote