Case Study: Steel plant updates tripper machine welding cable

Markets Served - Steel & Aluminum

Customer Problem:

A steel plant customer had a 150' run of 600 volt welding cable that was only lasting 6 months before needing to replace it. It would get pretty beat up when it would get dragged over sharp metal pieces. They also needed it to stay flexible in the outdoor application.

TPC Solution:

Even though TPC cable was almost double the price per foot, they replaced the cable in 20 welding units with TPC’s 600 volt 2/0 welding cable.

A High-Flex Cable That Doesn’t Disappoint:

The customer hasn’t had to replace the cable in the welding/tripper machine applications for 70 months! This is a material cost savings of over $172,000 and a labor cost savings of over $150,000. Over a nearly 6-year time frame, it saved over 5,560 production hours.

 

Download the printable PDF.

This cable [TPC’s Chem-Gard® 12/4] was all it was represented to be and more. My electricians loved working with it.
Robert M Rooker
Maintenance Manager, Sister Schubert’s Homemade Rolls

YOUR SOLUTION STARTS HERE

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote