CASE STUDY: Medium Voltage Cables and Storage & Deployment Solution Help Utility Crews Deploy Emergency Power Connections

turret trailer 2026 ATPC watertower logo

INDUSTRY PROBLEM:

Utility crews performing substation maintenance or responding to outage events often need to deploy temporary medium-voltage power systems quickly and safely. Traditional cable deployment methods can create challenges in crowded substations, confined work areas, or emergency situations where trailer positioning options are limited. In many cases, medium-voltage cables must also be terminated and tested in the field, adding hours to deployment timelines and increasing labor requirements before temporary power can be energized.
 

AMPHENOL TPC SOLUTION:

test Turret trailer

A major U.S. utility partnered with Amphenol TPC Wire & Cable to develop a complete medium-voltage storage and deployment solution that would improve flexibility, simplify setup, and enhance crew safety during maintenance and recovery operations.

 

Working closely with the utility's engineering team, ATPC supplied flexible medium-voltage cable assemblies that were fully terminated, electrically tested, and loaded onto a field-ready custom deployment trailer before delivery. This eliminated the need for time-consuming field termination and testing while ensuring the assemblies were deployment-ready upon arrival.

 

To address deployment challenges in congested substations and difficult access locations, the trailer was engineered with a 360-degree rotating turret that allows cable to be paid out in virtually any direction. Crews can position the trailer where space allows and then rotate the reel to achieve the optimal deployment path, reducing setup complexity and minimizing the risk of equipment or cable damage.

CUSTOMER’S RESULT:

The utility gained a safer, more efficient medium-voltage cable deployment system that reduced setup time and improved operational flexibility. With pre-terminated and pre-tested cable assemblies, crews could eliminate hours of field preparation work and respond more quickly during both planned maintenance and emergency restoration events.

 

Utility crew advantages, faster emergency response, safer cable deplyment, greater deployment flexibility, and reduced setup time

 

The custom deployment trailer's rotating turret design enabled cable deployment in challenging locations without requiring precise trailer positioning, helping crews safely maneuver cable while reducing the potential for damage. The result was a deployment-ready solution that improved safety, increased efficiency, and provided greater flexibility for critical substation maintenance and power restoration operations.

 

Learn how Amphenol TPC's custom-engineered medium-voltage storage and deployment solution helped a major utility simplify cable deployment, improve crew safety, and accelerate emergency power connections.

 

Download a printable PDF.

Your tool gets most of the job done with less time taken and fewer hazards to the operator!
Tyler McLaughlin
TT Electronics-IMS