POWERING THE FUTURE OF WIND ENERGY WITH SLIP RING HARNESS ASSEMBLIES

wind power amazon ge reports

Customer Background
A leading renewable energy provider operates dozens of wind farms across North America and has invested heavily in infrastructure to support its mission of delivering sustainable power. The company is a pioneer in repowering older wind turbines to extend their lifespan and boost performance.

Challenge
During a large-scale repowering initiative involving GE 1.5 MW wind turbines, the customer encountered a recurring failure in the slip ring harnesses. The original cable jackets were being damaged during turbine operation, and the internal conductors weren’t holding up under the continuous movement and stress. As a result, more than 60 turbines were offline, leading to decreased energy output and operational delays.

ATPC Solution
Slip Ring Harness for Wind Turbines_Web

 

Amphenol TPC Wire & Cable engineered a custom Slip Ring Harness (MA31439F022) designed to handle the demanding conditions inside the GE 1.5 turbine nacelle. Key features included:

  • 22-foot assembly built for durability in harsh environments
  • Multiple conductor types: 8/3, 14/4, and 18/3
  • Each lead stripped, labeled, and terminated with ferrules for fast, secure installation
  • Robust construction to resist premature wear and failure that affected the original harnesses

This design provided a long-lasting, application-specific solution to eliminate recurring downtime.

 

Implementation

ATPC-PowerGen Win Landing Page Graphics-01
Collaboration was key to the success of this project. Amphenol TPC coordinated closely with site managers, purchasing teams, and maintenance personnel to understand the turbine configuration and performance demands. Cables and components were built ahead of schedule, and the customer received regular updates throughout the process to ensure transparency and alignment.

Results & Impact

  • 60+ turbines returned to full operation, significantly improving uptime and productivity
  • Durable harness design resolved the mechanical and wear issues from the original assemblies
  • Stronger working relationships established with operations and procurement teams across multiple wind farms
  • Amphenol TPC demonstrated its capability to provide customized solutions that minimize downtime and prolong equipment life.
⬇️ Watch below to hear from Matt Kitis, Utility Specialist at ATPC, as he shares the story behind this powerful solution. 

 

 

Facing cable failures or reliability issues in your wind energy operations? Partner with Amphenol TPC Wire & Cable for application-specific solutions built to perform in the harshest conditions. Let’s get you back online—faster and more reliably.

 

We have been using Super-Trex® Welding Cables from TPC Wire and Cable. They are lasting much longer and with fewer repairs. Our MSHA citations have also been almost eliminated!
Travis Kirk
Prep Plant Supervisor, The Marshall County Coal Company’s Marshall County Mine

YOUR SOLUTION STARTS HERE

Reach out today, and an experienced technical expert will contact you to assess your needs and provide an initial quote.
Request A Quote